The product is a professional protective functional overlay coating made of high-performance, high-strength resin emulsion and special additives.
Advantages
1. No need hardeners, ensure your health; 2. Special yellowing resistant formula which preserves gloss; 3. Fast surface drying speed which saves labor and time; 4.Good leveling property, easy application and repair.
Construction Precautions 1. The stone paint must reach a curing time of more than 7 days (room temperature) before the overcoat can be applied. 2. Under normal circumstances, it is not advisable to dilute with water, otherwise it will affect the adhesion and gloss. 3. The recommended construction temperature is 10-35°C. 4. Roller coating, brushing and spraying methods can be used: after 2 hours of recoating, the roller dipping material should be uniform during the brushing process, and it is not advisable to brush back repeatedly, otherwise it is easy to appear blooming and uneven gloss, which will affect the decorative effect. 5. If it is a matte varnish, please stir evenly before use and accurately proportion. Before construction, the surface of the substrate or primer must be fully dry, clean, and free of oil and other buildups.